Session Log — Cowork v3 (2026-03-10)
Agent: @D_Claude_Sonnet (Cowork)
Work Completed
- YM Mass Gap Proof Chain — Full adversarial analysis
- Mapped 5-step RTSG proof chain against Clay requirements
- Identified 5 structural gaps (A-E)
- GAP A (continuum limit): CRITICAL — nobody has rigorously constructed 4D non-abelian gauge theory
- GAP B (Balaban completion): Large-field analysis incomplete — the hard 20%
- GAP C (GL truncation): Informally OK but not rigorous
- GAP D (alpha > 0): CIRCULAR — needs confinement to prove, which is what we are trying to prove
- GAP E (spectral gap C*C): Pure conjecture, no path to proof yet
- Adjusted confidence: 55% → 15%
- U comparison: YM > RH (larger attack surface, constructive gap not dead-end)
Recommendation
- Prioritize YM over RH for network compute
- Phase 1: Literature deep-dive on Balaban, Chatterjee, functional RG
- Phase 2: RTSG-specific contributions (graded BRST d2, spectral gap in solvable models)
- Phase 3: The hard constructive QFT part
Prior Session Work (carried over)
- 12 RTSG books produced (all .docx in workspace)
- RH escape routes: all 4 dead (Shimura, Weil, direct, de Branges)
- GPT adversarial RH analysis processed
- Gemini Session 5 reviewed + boundedness argument killed
- Grok outreach deliverable processed